Vol. 41 (Issue 36) Year 2020. Art. 10
Received: 15/05/2020 • Approved: 23/08/2020 • Published 24/09/2020
KHAHRO, Shabir H. 1
ALI, Tauha H. 2
KHAHRO, Qasim H. 3
MORIYANI, Muhammad A. 4
VIGHIO, Anees A.
Abstract
Precise estimation of the completion time of the project at the initial stages of the project is crucial for the preparation of the tenders. Conventionally, it is done by the engineers inaccurately using their experience with the projects which is not backed by any mathematical models. This study develops the time-cost relationship equations which can effectively estimate the delivery date of construction projects in Pakistan. This enhances the decision making of the professionals to accurately predict the time of the project.
key words: BTC model, project time, relationship of time-cost, regression
Abstracto
La estimación precisa del tiempo de finalización del proyecto en las etapas iniciales es crucial para la preparación de las ofertas. Convencionalmente, los ingenieros lo hacen utilizando su experiencia con los proyectos de manera incorrecta, lo que no está respaldado por ningún modelo matemático. Este estudio desarrolla las ecuaciones de relación tiempo-costo que pueden estimar efectivamente la fecha de entrega de los proyectos de construcción en Pakistán. Esto mejora la toma de decisiones de los profesionales para predecir con precisión el tiempo del proyecto.
palabras clave: modelo BTC, tiempo del proyecto, relación tiempo-costo, regresión
1. Lecturer, Department of Engineering Management, Prince Sultan University, Saudi Arabia (shkhahro@psu.edu.sa)
2. Professor, Civil Engineering Department, Mehran University of Engineering & Technology, Jamshoro, Pakistan
3. Post Graduate Student, Mehran University of Engineering & Technology, Jamshoro, Pakistan
4. Lecturer, Mehran University of Engineering & Technology, Jamshoro, Pakistan
[Index]
revistaespacios.com
This work is under a Creative Commons Attribution-
NonCommercial 4.0 International License